    CASE STUDY | Lewisham Gateway

    16th November 2016

    PFC Corofil was delighted to be involved in the construction of an exciting and vibrant new mixed-use development in South East London.

    Lewisham Gateway, a residential and retail solution designed to unify the previously closed off town centre - opening up transport links and uniting the surrounding communities – involved, among other structures, the construction of a 25 storey residential tower block.

    The build specification required a decorative stone rainscreen cladding panel and a passive fire protection solution which could accommodate a fully ventilated vertical and horizontal cavity firestop behind the panels, providing the required fire protection for the cavity size and type of the building.

    To achieve this and provide a safer and more effective passive fire protection system, PFC Corofil worked with the project designer, main contractor and sub-contractor providing technical advice and support to develop a bespoke solution.

    The resulting specification, which included a 120 minute horizontal ventilated rainscreen fire barrier and a 60 minute vertical ventilated rainscreen fire barrier, resulted in a fully protected and fire rated rainscreen cavity barrier system ready for the next stage of the build.

    “Stanta were happy to use PFC Corofil on this project as they provided good technical support during early design, followed by site inspection visits once the material was specified and installed.”